Home/Tank farms

Turnkey tank farms

We design and build storage farms for liquid, gaseous and bulk products — from capacity calculation to handing the facility over for operation.

Within an hourreply with a technical and commercial proposal for your task
In 30 daysfirst shipment for erection — you don’t wait for the whole batch
60–180 daysturnkey project: from design to commissioning
24 monthswarranty on manufacturing and erection

The whole facility, not just individual tanks

A tank farm is not just a few tanks side by side, but an interconnected process complex: bunding, pipelines, pump stations, loading and unloading units, metering instruments, fire suppression and lightning protection. Every element depends on the others, and an error in one place stops the whole facility.

We run such projects from surveys and calculation through to commissioning, remaining the single responsible party. The customer does not have to coordinate the designer, the plant and the erection crew.

What the facility includes

  • RVS and RGS tanks of the required volume and design
  • Bunding or a protective wall
  • Process piping, pipelines, shut-off valves
  • Pump stations and loading units — road and rail
  • Level measurement and product metering systems
  • Fire suppression, lightning protection, earthing
  • Electric heating and insulation for viscous products
Tank farm with process pipe rack and piping
Turnkey lead time
60 – 180 days
Design
KM, KMD, approvals
Warranty
24 months
Geography
all of Russia

How the work goes

1. Survey and calculation

We inspect the site and study the task: which products, what volumes, what turnover. We calculate the required farm capacity and select the tank composition.

2. Design

We develop the documentation and, where necessary, go through industrial safety expertise. Petroleum product farms are classified as hazardous production facilities, and the documents are checked closely.

3. Manufacturing and supply

We make the steel structures at our own facility. We ship in parts: the first batch leaves in 30 days and erection starts without waiting for the full set.

4. Erection and handover

We assemble, test and hand over with the full package: passports, inspection records, as-built documentation. After that — service and diagnostics according to the schedule.

Need a calculation for your project?

Send the technical specification or describe the task — we will reply with a calculation within an hour.

Submit a request Download the questionnaire (RU)